All issues are systematically identified and addressed in the various stages of the implementation of projects. It provides a systematic approach for identifying the various possible environmental impacts at the different stages of the scheme cycle, to identify appropriate mitigation measures for Read More
MeteorologyWater QualityAmbient AirQualityNoise levelsEcologyGeologySoilSocio-economicLand Use
Environmental Clearance (EIA) CRZ Clearance State Pollution Control Board Consent Central Ground Water Authority Clearance Forest Clearance Hazardous Waste Authorization Bio Medical Waste Authorization E-Waste Authorization Scrap Import Authorization State Pollution Control Board Compliance
– Preliminary site visit to conduct site survey and analyzing the soil lithology, hydrogeology and site contours. – Generation of 10 km radius maps of Surface water body, Topographical, Physiographical features using GIS. – Generation of Flood inundation maps covering 10 km Read More
Socio- Economic status of the population is an indicator for the development of the region. Any developmental project will have a bearing on the living conditions and on the economic base of population in particular and the region as a whole. Similarly, Read More
The Forest (Conservation) Act, 1980, insists on prior approval from Central Government for diversion of forest lands for the non-forestry purposes. In the national interest this Act, regulates the diversion of forest lands to non-forestry purposes. The basic objective of the Act Read More
Since, Air Quality is affected by a variety of complex sources, detailed scientific studies are required for identification of major sources, assessing their contributions to air pollution and suggest mitigation measures taking into consideration the techno-economic feasibility and other social factors. Accordingly Read More
Industries decide to undertake environmental audits in order to obtain an independent external assessment whether the management has created efficient environmental policy and provided for acceptable environmental attitude. The most important results of the environmental audits are recommendations how a company can Read More
Preparation of environmental management plan is required for formulation, implementation and monitoring of environmental protection measures during and after commissioning of projects.It indicates the details of various measures that are proposed to be taken including cost components. Cost of measures for environmental Read More
All new projects or activities, expansion and modernization of existing projects, any change in product – mix listed in the Schedule to the EIA Notification 2006 requires prior Environmental Clearance from MoEF/SEIAA. On basis of Terms of reference issued by the Expert Read More